Camp Notse Primary School Construction
Running Projects

Location: Notse, Togo

Design-build project for construction of two new 3- classroom buildings with office and storeroom, a new 8-stall Ventilated Improved Pit (VIP) latrine building (4 stalls for females/ 4 stalls for males), a new rainwater collection system with four taps for hand washing for each new classroom building, and a new solar power electrical system for each new classroom building in Notse, Togo.

The new classroom buildings and latrine facilities shall be permanent structures utilizing reinforced concrete and CMU block construction methods. The rainwater collection systems shall collect roof runoff from the new school building and supply water for hand washing.

Services

  • Design Development
  • Technical Design
  • Construction Documents
 
© 2016-2017 CDCegypt

Developed and Hosted By Gates2Host Web services