Kpakpa Agbagoulè High School Construction
Running Projects

Location: Dassa-Zoume, Benin

Design-build project for construction of a new two classroom school building with office and storeroom, a new 8-stall Ventilated Improved Pit (VIP) latrine building (4 stalls for females/ 4 stalls for males), a new solar power electrical system connected to the new school building, and a new rainwater collection system with four taps for hand washing in Dassa- Zoume, Benin.

The new school and latrine facilities shall be permanent structures utilizing reinforced concrete and CMU block construction methods. The rainwater collection system shall collect roof runoff from the new school building and supply water to four taps for hand washing.


Services

  • Design Development
  • Technical Design
  • Construction Documents
 
© 2016-2017 CDCegypt

Developed and Hosted By Gates2Host Web services