Cost: $ 18,000,000

 

The project consists of the design, construction, and renovation of the G-2 Intelligence and Command Headquarters

 

Scope of work

CDC's scope of work included:

1.     Master Plan;

2.     Designing of;   

·       Dining facility, barracks, administration buildings, latrine facilities, gym/auditorium, recreation center/library/market building, laundry facilities, fire station, guard towers/buildings and vehicle maintenance facility plus the motor pool for 500 vehicles to include Petroleum Oil Lubricant Storage Building and Fuel Point;

·       A band practice hall, running track, and soccer field; renovation of the parade ground and swimming pool;

·       Entry control buildings, bunker, Prime Power Plant and electrical distribution system;

·       Development of raw water source (i.e. ground source water wells) to support approximately 1500 persons;

·       Sanitary sewer collection and treatment system;

·       Development of water wells; potable water booster pumps and associated controls; installation of water   distribution system and Water storage tower and tanks;

·       Data, voice and emergency communication systems including centralized communications hub, and underground copper cable installed in duct bank system;

·       Repair of perimeter wall in accordance with Anti- Terrorism/Force-Protection measures; Design and renovate access roads.

·       Drainage Plan incorporating a storm water run-off plan and allowing for proper site drainage to include grading throughout the site with drainage for new and existing structures.

 

 Services

·   Conceptual Design

·   Working Drawings

 